Projects / Vattenfall Zonnepark 20 kV / 3.15 MVA, 8 units, 45 MW grid connection
Renewable Energy

Vattenfall Zonnepark 20 kV / 3.15 MVA, 8 units, 45 MW grid connection

Protrafo supplied 8 oil-type distribution transformers for Vattenfall's 45 MW solar park, completing the grid connection on schedule despite tight project timelines.

Each of the 8 units was rated at 3.15 MVA, 20 kV and delivered pre-tested and ready for installation. The project required tight coordination between Protrafo, the EPC contractor, and the grid operator to meet the energization deadline.

All transformers were manufactured to meet ECODESIGN Tier 2 efficiency requirements and were tested to IEC 60076 standards before leaving our facility. Hermetically sealed tank construction ensures long-term outdoor reliability without regular maintenance.

This project demonstrates Protrafo's ability to deliver multi-unit renewable energy grid connections on time, with proven technical quality and full regulatory compliance.

8 units delivered

8 × 3.15 MVA oil-type distribution transformers, all pre-tested and energization-ready.

45 MW solar park

Full grid connection for one of the largest solar parks in the region, delivered on schedule.

ECODESIGN Tier 2 compliant

All units meet the latest EU efficiency standards for low no-load and load losses.

On-time delivery

Tight project timeline met through stock availability and fast logistics coordination.

Protrafo sales specialist