Protrafo successfully delivered ten 2,000 kVA oil-filled distribution transformers to a long-standing substation construction partner in the Netherlands. These units were part of a coordinated supply for multiple substation projects aimed at strengthening regional grid capacity and supporting new infrastructure developments.
Each transformer was engineered to meet the client’s specific technical requirements, including customized connection points, protection features, and compact dimensions for optimal integration into prefabricated substations. All units comply with ECODESIGN Tier 2 efficiency standards and were tested in an accredited laboratory before shipment.
Protrafo’s scope included:
Production coordination with our European manufacturing partner
Factory testing and quality control in the Netherlands
Just-in-time delivery to multiple project locations
Technical documentation and installation guidance
This project highlights our ability to deliver reliable, high-quality transformer solutions on scale—backed by strong partnerships and streamlined logistics.
This delivery reinforces our strong collaboration with key substation builders in the Netherlands and demonstrates Protrafo’s capability to supply efficient, tailor-made transformer solutions on a larger scale. By combining technical flexibility with logistical reliability, we help our partners deliver high-quality energy infrastructure—on time and to specification.
Each transformer tailored to the client’s connection and installation requirements.
Low-loss performance aligned with the latest European efficiency standards.
Full factory testing and final inspection before delivery.
On-time transport and supply for multiple substation locations across the country.
Find answers to common questions about this project and how we work.
Our oil-filled transformers use advanced oil cooling technology to efficiently dissipate heat and reduce energy losses. This ensures stable voltage regulation, improved power quality, and minimal downtime, making them a cost-effective solution for your power distribution needs.
Yes, we provide on-site coordination and, if required, technical assistance to ensure a smooth installation process.
Every transformer is professionally packaged and secured according to industry standards. We work with experienced logistics partners to minimize risks during transport.
Production time for an oil-filled transformer typically ranges from 6 to 12 weeks, depending on the specifications, capacity, and required certifications. For urgent projects, Protrafo can deliver from stock or offer accelerated production in coordination with our manufacturing partners. Custom-built units with special features may require additional lead time.
The Tier 2 Ecodesign norm, effective from July 1, 2021, sets stricter limits on energy losses for power transformers within the EU. It focuses on reducing both no-load and load losses to improve overall efficiency and lower environmental impact. The regulation applies to distribution and power transformers from 1 kVA up to 3150 kVA and beyond, promoting the use of optimized core materials and advanced design standards. Compliance is mandatory for new installations within the European market.